1. front panel controls – Miller Electric D-64 User Manual
Page 22
OM-1582 Page 18
SECTION 5 – OPERATION
5-1.
Front Panel Controls
1
Voltmeter (Optional) (See Section
4-10)
2
Wire Speed Meter (Optional)
Factory set to display inches per minute. If
display of meters per minute is desired, see
Section 4-10.
3
Schedule A Wire Speed Control
The scale is calibrated in inches per minute
x 100 and meter per minute.
4
Schedule A Voltage Control
(Optional)
.
For dual schedule applications, a dual
schedule switch is required for the gun.
Obtain a proper dual schedule switch
and install according to its instructions.
5
Schedule B Indicator Light (Optional)
6
Schedule B Wire Speed Control
(Optional)
7
Schedule B Voltage Control
(Optional)
8
Press To Set Button (Optional)
Press and hold button to preset Schedule B
wire feed speed and/or voltage.
9
Left And Right Indicator Lights
10 Jog/Purge Switch
Push up to momentarily feed welding wire at
speed set on Wire Speed control without en-
ergizing welding circuit or shielding gas
valve.
Push down to momentarily energize gas
valve to purge air from gun or adjust gas reg-
ulator.
Center position is off.
ST-152 647
Schedule B
Schedule A
1
2
3
4
5
6
7
8
9
10
4
3
5
7
6
8
9
10