beautypg.com

1. front panel controls – Miller Electric D-64 User Manual

Page 22

background image

OM-1582 Page 18

SECTION 5 – OPERATION

5-1.

Front Panel Controls

1

Voltmeter (Optional) (See Section
4-10)

2

Wire Speed Meter (Optional)

Factory set to display inches per minute. If
display of meters per minute is desired, see
Section 4-10.

3

Schedule A Wire Speed Control

The scale is calibrated in inches per minute
x 100 and meter per minute.

4

Schedule A Voltage Control
(Optional)

.

For dual schedule applications, a dual
schedule switch is required for the gun.
Obtain a proper dual schedule switch
and install according to its instructions.

5

Schedule B Indicator Light (Optional)

6

Schedule B Wire Speed Control
(Optional)

7

Schedule B Voltage Control
(Optional)

8

Press To Set Button (Optional)

Press and hold button to preset Schedule B
wire feed speed and/or voltage.

9

Left And Right Indicator Lights

10 Jog/Purge Switch

Push up to momentarily feed welding wire at
speed set on Wire Speed control without en-
ergizing welding circuit or shielding gas
valve.

Push down to momentarily energize gas
valve to purge air from gun or adjust gas reg-
ulator.

Center position is off.

ST-152 647

Schedule B

Schedule A

1

2

3

4

5

6

7

8

9

10

4

3

5

7

6

8

9

10