Chapter 5: maintenance, 1 preventative maintenance schedule, Chapter 5 – MITSUBISHI ELECTRIC 882.00273.00 User Manual
Page 64: Maintenance, Preventative maintenance schedule, Photocopy this page for your maintenance records, Every week
Chapter 5: Maintenance
5-1 Preventative Maintenance Schedule
The mechanical design of the blender is very simple and very little maintenance is required.
The only moving parts are the metering gates, weigh hopper dump valve, and mixer agitator.
The checklist below contains a list of items which should be inspected and/or replaced to
keep your blender operating at peak efficiency. Perform each inspection at the regular
intervals listed below.
Figure 50: Sample Preventative Maintenance Schedule
System model #
Serial #
Daily
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Inspect blender for
any loose parts-
tighten them
immediately.
Verify quality of
compressed air
supply.
Verify mixer door is
properly latched.
Every week
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Inspect metering
gates for proper
operation.
Check to make
sure that all hose
connections are air
tight.
Every month
Jan Feb Mar Apr May
Jun
Jul
Aug
Sep Oct Nov
Dec
Inspect air regulator
and air safety
circuits, if equipped.
Recalibrate blender
only If necessary.
Photocopy this page for your maintenance records
BF1-615.3
Chapter 5: 4BMaintenance
64 of 101