beautypg.com

4 generator tests under load, 5 checking automatic operation – Guardian Technologies 005282 User Manual

Page 15

background image

13

Section 2 — Post Installation Start-up and Adjustments

Air-cooled Generators

2.4 GENERATOR

TESTS UNDER LOAD

To test the generator set with electrical loads applied,
proceed as follows:

1. Set generator’s main circuit breaker to its OFF

(or OPEN) position.

2. Turn OFF all breakers on the load center of the

transfer box (T1 and T2).

3. Set the generator's AUTO/OFF/MANUAL switch to

OFF.

4. Turn OFF the utility power supply to the transfer

switch, using the means provided (such as a util-
ity main line circuit breaker).

Do not attempt manual transfer switch opera-

tion until all power voltage supplies to the
transfer switch have been positively turned off.
Failure to turn off all power voltage supplies
will result in extremely hazardous and possibly
fatal electrical shock.

5. Manually set the transfer switch to the STANDBY

position, i.e., load terminals connected to the
generator's E1/E2 terminals. The transfer switch
operating lever should be down.

6. Set the generator's AUTO/OFF/MANUAL switch

to MANUAL. The engine should crank and start
immediately.

7. Let the engine stabilize and warm up for a few

minutes.

8. Set the generator’s main circuit breaker to its ON

(or closed) position. Loads are now powered by
the standby generator.

9. Turn ON the load center of the transfer switch

(T1 and T2).

10. Connect an accurate AC voltmeter and a frequen-

cy meter across terminal lugs E1 and E2.

• 7kW voltage should be greater than 230 volts and

frequency should be greater than 58 Hz.

• 10, 13 & 16kW voltage should be greater than

240 volts and frequency should be greater than
60 Hz.

11. Let the generator run at full rated load for 20-30

minutes. Listen for unusual noises, vibration or
other indications of abnormal operation. Check
for oil leaks, evidence of overheating, etc.

12. When testing under load is complete, turn OFF

electrical loads.

13. Set the generator's main circuit breaker to its

OFF (or OPEN) position.

14. Let the engine run at no-load for a few minutes.
15. Set the AUTO/OFF/MANUAL switch to OFF. The

engine should shut down.

2.5

CHECKING AUTOMATIC
OPERATION

To check the system for proper automatic operation,
proceed as follows:

1. Set generator’s main circuit breaker to its OFF

(or OPEN) position.

2. Check that the AUTO/OFF/MANUAL switch is set

to OFF.

3. Turn OFF the utility power supply to the transfer

switch, using means provided (such as a utility
main line circuit breaker).

4. Manually set the transfer switch to the UTILITY

position, i.e., load terminals connected to the util-
ity power source side.

5. Turn ON the utility power supply to the transfer

switch, using the means provided (such as a util-
ity main line circuit breaker).

6. Set the generator's main circuit breaker to its ON

(or CLOSED)) position.

7. Set the AUTO/OFF/MANUAL switch to AUTO. The

system is now ready for automatic operation.

8. Turn OFF the utility power supply to the transfer

switch.

With the AUTO/OFF/MANUAL switch at AUTO, the
engine should crank and start when the utility source
power is turned OFF after a 10 second delay. After
starting, the transfer switch should connect load cir-
cuits to the standby side after a 15 second delay. Let
the system go through its entire automatic sequence
of operation.

With the generator running and loads powered by
generator AC output, turn ON the utility power supply
to the transfer switch. The following should occur:

After about 15 seconds, the switch should transfer

loads back to the utility power source.

About one minute after retransfer, the engine

should shut down.

2.6

ADJUSTING THE FUEL REGULATOR
- 7KW (NATURAL GAS ONLY)

NOTE:

All V-twin engine units DO NOT require a fuel reg-
ulator adjustment due to the fuel system design.

Although the generator has been factory set to pro-
vide maximum power, it may be necessary in some
areas to adjust this setting. If experiencing engine
problems at high or full load conditions, follow these
steps. It will require a frequency meter to perform
this procedure.

This manual is related to the following products: