beautypg.com

Preparing to install the refrigerator, Installation refrigerator instructions, Important – GE Monogram 22 User Manual

Page 22

background image

BEFORE YOU BEGIN

Read these instructions completely
and carefully.

IMPORTANT

Save these

instructions for local inspector’s use.

IMPORTANT

Observe all

governing codes and ordinances.

• Note to Installer – Be sure to leave these

instructions with the Consumer.

• Note to Consumer – Keep these

instructions for future reference.

• Skill level – Installation of this appliance

requires basic mechanical skills.

• Completion time – Refrigerator Installation

30 minutes

Water Line Installation
30 minutes

Proper installation is the responsibility of

the installer.

Product failure due to improper installation

is not covered under the Warranty.

If the refrigerator has already been installed,
remove the base grille (see Step 2 in Moving
the Refrigerator
), then skip to Step 5 in
Installing the Refrigerator
.

Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com

In Canada, call 1.800.361.3400 or Visit our Website at: geappliances.ca

Installation

Refrigerator

Instructions

Models 22, 23, 25, 26, 27 & 29

If the refrigerator has an icemaker, it will have
to be connected to a cold water line. A GE
water supply kit (containing tubing, shutoff
valve, fittings and instructions) is available
at extra cost from your dealer, by visiting
our Website at ge.com (in Canada at
geappliances.ca) or from Parts and
Accessories, 800.626.2002 (in Canada
1.888.261.3055).

PREPARATION

WATER SUPPLY TO THE ICEMAKER

TOOLS YOU WILL NEED

22

Phillips Head Screwdriver

3/8

″ and 5/16″ Socket

1/2

″ and 7/16″ Wrench

Plastic Putty Knife

1/8

″ Hex Wrench