beautypg.com

Grundig Digital Radio User Manual

Page 61

background image

DIGITAL RADIO GUIDE

TERRESTRIAL TRANSMISSION SYSTEMS - ISSUES

61

Figure 4.20: Estimation of the channel usage in Band III for T-DAB

(RPC4: suitable for mobile reception; RPC5: suitable for portable indoor reception)

0

100

200

300

400

500

600

5A

5B

5C

5D

6A

6B

6C

6D

7A

7B

7C

7D

8A

8B

8C

8D

9A

9B

9C

9D

10A

10B

10C

10D

11A

11B

11C

11D

12A

12B

12C

12D

Frequency Blocks

Number of Entries

RPC4

RPC5

Figure 4.20 shows that T-DAB mobile reception (RPC4) represents the major proportion
of the T-DAB requirements and that channels 11 and 12 are the most used for T-DAB.

The GE06 Agreement offers a great deal of flexibility for using a digital entry in the plan
for another application provided that the peak power density in any 4 kHz is respected.
Such flexibility can allow, for example, for using a DVB-T entry by 4 x T-DAB entries or by
4 x T-DMB entries and also can allow for accommodating future developments of digital
technology.

The end of the transition period for Band III has been fixed to 2015 (for some non-
European countries is 2020, see details in Figure 4.21). During that period analogue
television has to be protected. Around 25% of the T-DAB entries in the new plan have to
be coordinated with analogue television in neighbouring countries before implementation.
As a consequence, certain constraints (time constraints, power reduction, particular
antenna patterns, etc.) might be imposed to those T-DAB requirements during the
transition period. In addition, around 7% will have to coordinate with other digital
requirements and around 2.5% with other primary services (e.g., PMR - Private Mobile
Radio).