Installation instructions, Installation – Stovax STUDIO 8700CFCHEC User Manual
Page 16
16
INSTALLATION INSTRUCTIONS
INSTALLATION
13
AR1887
wall plate
Because of the high temperatures this fire achieves, it is
advisable to use marble slips or similar material between the
appliance and the plasterboard
Never use a one-piece slip as expansion (even cracking)
can occur. If a slip is used, longer screws are needed to
secure the appliance.
• Connect the flue system and gas services using the
opening in the side of the chimney breast for access. After
commissioning, finish the sides of the chimney breast,
Diagram 14
14
AR1905
3.3 STUD WORk INSTALLATION METHOD 2 (EDGE)
For this cool-wall Edge installation, the convected heat of
the fire is channelled into the chimney cavity and vented at
the top.
There is an optional Studio 1 Edge Fixing Kit available for
installing the fire without a frame. CODE No. 8727CFFK01
(STUDIO 1) 8727CFFK02 (STUDIO 2).Using the fixing kit:
• Fit the two side and bottom channels to the front flange
of the fire, Diagram 15. There is a deliberate gap at the top
for convected heat
15
AR1912
This now determines the width of your two vertical stud
work supports. The kit has been designed so that 12mm
thick plasterboard can be taken to the three channels,
Diagram 16
16
AR1934
• Fix the edge of the vertical support flush to the edge of
the channel
Build the stud work chimney breast to the desired size:
• Ensure all clearances to combustible material are
maintained, 3.1 above
17
AR1902
• Fit non-combustible board to the stud work above the
fire. This should extend a minimum of 400mm above the
appliance.
• Fit plasterboard to the remaining chimney breast front
• Decide on the position for the wall box containing the
batteries and wall switch
• Mount it into the stud work chimney breast connecting
up the wires from the fire, see Stud Work Installation with
Frame for wiring detail on previous page
• Connect the flue system and gas services using the
opening in the side of the chimney breast for access
After commissioning, finish the sides of the chimney breast,
Diagram 18