1

2.0

INSTALLATION

2.1

Mounting the Unit

When installing your new GE Osmonics reverse osmosis (RO) machine, allow at least
45-inches (114.3 cm) above the machine for membrane element removal and loading. If
space is not available, the entire membrane element housing can be removed for
membrane element change-outs. If the membrane element housings are to be removed to
change-out the membrane elements, at least 25-inches (65.3 cm) is required at one end of
each membrane element housing and 6-inches (15.2 cm) behind the machine.

2.2

Plumbing

The feed water source must be able to provide water quantity and pressures to maintain an

operating feed water pressure of 30 - 60 psi (2.1 - 4.1 bar). If the feed water pressure with
the machine is in excess of 60 psi (4.1 bar) or fluctuates by more than 5 psi
(0.34 bar) a pressure regulator should be installed upstream of the machine inlet. If prop-
er water pressure cannot be maintained to the RO, a booster pump may need to be installed
in front of the pretreatment to provide the proper water quantity and pressure for the oper-
ation of the machine.

2.3

Plumbing Connections

Connect proper size drain line to the concentrate outlet (Table 2.1, E2/EZ2-Series
Machine Piping Connections) and run to an open drain. The drain capacity needs to be
large enough to properly drain the feed water flow of the RO.

Table 2.1

E2/EZ2- Series Machine

Piping Connections

C O N N E C T I O N S

Inlet

inch (cm)

Permeate
inch (cm)

Concentrate

inch (cm)

0.38 (0.96)

0.38 (0.96)

0.38 (0.96)