beautypg.com

Storage tank and startup, Installation instructions storage tank and startup, Caution – GE PNRQ20FRI User Manual

Page 17

background image

Installation Instructions

STORAGE TANK AND STARTUP

STORAGE TANK INSTALLATION

1. Remove the protective cap from the top

of the tank.

2. Apply 2–3 wraps

of thread tape,
in a clockwise
direction, to the
tank threads.

3. Install the push-to-connect fittings on the

threaded fitting on the tank as shown.

4. Push the 3/8

″ red banded tubing from the

Reverse Osmosis System into the fitting
on the storage tank.

SYSTEM STARTUP PROCEDURE

CAUTION:

If installing the unit in

new construction, ensure that house plumbing
is flushed thoroughly before opening the water
supply valve.

1. Check that all tubing connections are

secure.

2. Turn on the Feed Water Supply Valve.

3. Check all connection points for leaks.

4. Follow the Sanitization procedures on

page 19.

5. After sanitization is complete, reinstall

prefilter, postfilter and Reverse Osmosis
cartridges.

6. Membrane contains a food grade

preservative. Allow the system to fill the
tank, then drain it completely four times
before using the water from the system.

7. Recheck all water connection points a few

days later to check for small leaks.

Storage

tank

Thread

tape

17

This manual is related to the following products: