beautypg.com

Cutout for single built-in oven under counter, Installation instructions, Side by side installations – GE ZET1 User Manual

Page 6

background image

6

Installation Instructions

Cutout for Single Built-In Oven
Under Counter

A3

MUST SUPPORT 200 LBS.

25

(63.5 cm)

24

(61 cm)

Gas and electrical connections for
30

(76.2 cm) gas cooktop must be

located in an adjacent accessible
location to the right. For 36

(91.4 cm)

gas cooktop, the connections may be
made to the left.

36

(91.4 cm)

Typical
Countertop
Height

22

(55.9 cm)

Min.

Above

Support
Platform

Top and/or side fillers
may be necessary
if unit is positioned
between existing
cabinets. Be sure
they are attached
securely, since they
will anchor the oven
in the cabinet.

Gas or electric cooktops may
be installed over this oven.
See cooktop installation
instructions for cutout size.
See label on top of oven for
approved cooktop models.

28 1/2

(72.4 cm) Min.
28 5/8

(72.6 cm) Max.

NOTE: This oven is only approved to be
installed under the specific models as
labeled on this unit.

7 3/4

(19.7 cm)

27 1/4

(69.2 cm) Min.
27 5/16

(69.4 cm) Max.

Allow 1

(2.5 cm)

overlap top of
oven and
11/16

(1.8 cm)

overlap side
edges of
cutout

Max.

(90 KG)

Side by Side Installations

Install two wall ovens in separate cutouts.
Allow 2

(5.1 cm) min. between cutouts.

Cutout –

Observe all

dimensions

and

requirements.

Cutout –

Observe all

dimensions

and

requirements.

240V / 208V
Junction Box
Location (junction
box may be in
adjacent cabinet)

Must
match
toekick
height

4

(10.2 cm)

Typical
Toekick

3/4

(1.9 cm)

Support Platform

Required

2

(5.1 cm)

Min.