beautypg.com

Installing the 5- and 8-port switches, Package contents, Attaching the rubber feet – Gateway Unmanaged Ethernet Switch User Manual

Page 14: Provide for adequate ventilation, Power on, Provide for adequate ventilation power on

background image

11

Installing the 5- and 8-port switches

www.gateway.com

Installing the 5- and 8-port
switches

Package contents

Open the shipping carton and carefully unpack its contents. The carton should
contain the following items:

One Gateway 7401-05 5-port, or 7401-08 8-Port 10/100/1000BASE-T
Gigabit Ethernet switch

Four rubber feet with adhesive backing

One external power adapter

This manual

If any item is found missing or damaged, contact Gateway for a replacement.

Attaching the rubber feet

Position and apply rubber feet to the underside of the switch.

Provide for adequate ventilation

Power on

Plug one end of the AC power adapter into the power connector on the switch
and the other end into the local power source outlet.

Warning

Do not place any device on top of the switch or place the
switch on top of any device or object that will block the free
flow of air through the ventilation slots on the sides, top,
and bottom of the switch’s case. In addition, care should
be taken not to locate the switch next to, on top of, or
underneath any device that generates a significant amount
of heat. For the switch to perform at its optimal level, the
switch must have adequate ventilation to prevent the switch
from overheating and becoming damaged.