beautypg.com

Before you connect to the network – Gateway Unmanaged Ethernet Switch User Manual

Page 13

background image

10

Chapter 2: Installation

www.gateway.com

Before you connect to the network

The site where you install the switch may greatly affect its performance. Please
follow these guidelines for setting up the switch:

Install the switch on a sturdy, level surface that can support at least 6.6
lbs. (3 kg) of weight. Do not place heavy objects on the switch.

The power outlet should be within 6 feet (1.82 meters) of the switch.

Visually inspect the power cord and see that it is fully secured to the AC
power port.

Make sure that there is correct heat dissipation from and adequate
ventilation around the switch. Leave at least 6 inches (152.3 mm) of space
at the front and rear of the switch for ventilation.

Install the switch in a fairly cool and dry place for the acceptable
temperature and humidity operating ranges.

Install the switch in a site free from strong electromagnetic field generators
(such as motors), vibration, dust, and direct exposure to sunlight.

When installing the switch on a level surface, attach the rubber feet to the
bottom of the device. The rubber feet cushion the switch, protect the casing
from scratches, and prevent it from scratching other surfaces.