beautypg.com

Installation, Hardware installation, 2 installation – FUJITSU MB91360 User Manual

Page 9

background image

STARTERKIT MB91360

Chapter 2 Installation

© Fujitsu Microelectronics Europe GmbH

- 9 -

UG-910006-13

2 Installation

2.1 Hardware

Installation

What you’ll need :

<

Host : IBM(-comp) PC with Windows 9x or Windows NT ; 1 COM-port

<

Power Requirements: A power supply, capable of supporting 9-12V DC at about 500
mA. Note that the power connector must be + at the shield and - in the centre. Power
supplies are available from Fujitsu.

<

RS232 : An ‘extension’ (1:1) RS232 cable with DB9 m+f connectors

Connect the power-supply (9-12V DC-input) and the RS232-cable

and switch on the Starterkit.

LED D10 should light up (power-indicator)

and LED D11 flashing (reset indicator).

During the initialization phase

the red monitor LED is on.

After that, a start message from the monitor

(“91360-STARTERKIT MONITOR VxLx”)

will be displayed on the LCD and the green user LED will light up.

The board is now ready to use.