beautypg.com

Friedrich X Star EQ08 User Manual

Page 11

background image

9

STEP 7

Cut two pieces of standard 1" lumber (supplied by installer) to the

length and width required. Place in front and back of bottom sill chan-

nel as shown in Figure G. Secure with nails (supplied by installer).

STEP 8

Seal all holes in the cabinet with caulking compound (supplied

by installer).

MORTAR

ELECTRICAL RECEPTACLE

POINT "X"

CABINET

CAULK ALL SIDES

Figure H

SOLID MASONRY CONSTRUCTION

NOTE: ELECTRICAL RECEPTACLE LOCATION
FROM POINT "X" MUST BE WITHIN A MAXIMUM

RADIUS OF 69" FOR 115V UNITS.

STEP 9

Complete the installation by following STEPS 6 through 10 of Sash

Window Instructions (Page 8). Window Seal Gasket mentioned
in STEP 8 will not be required.

IMPORTANT: Before operating your unit, read STEP 10 of Sash

Window Instructions.

This manual is related to the following products: