Frymaster FOOTPRINT 8196345 User Manual
Page 22
1-16
1.9.12 Replacing Frypot Insulation and/or Upper Burner Rails
NOTE: Replacing the burner rails requires completely tearing down the frypot and installing new
frypot insulation. Refer to the frypot exploded view below for component identification.
1. Remove the frypot per Section 1.9.11.
2. Remove the burner assemblies (1).
3. Remove insulation retainers and blanket insulation (2).
4. Remove the upper oil zone insulation bracket and upper oil zone insulation (3).
5. Remove the plenum (4).
6. Remove the front lower combustion chamber insulation retainer and insulation (5), and the front
lower combustion chamber inner insulation retainer and insulation (6). NOTE: Full-vat units
have two-piece insulation retainer and insulation components. Dual-vat units have one-piece
components.
7. Remove the upper combustion chamber insulation retainer and insulation (7).
8. Remove the inner upper combustion chamber insulation retainer and insulation (8).
9. Remove the rear lower combustion chamber retainers, back, and insulation (9). NOTE: Full-vat
units have two-piece backs and four retainers. Dual-vat units have one-piece backs and two
retainers.
10. Remove the flue assembly (10).
Disassembling A Frypot
(Full Vat Illustrated)
Spacer
s
Spacer
10
2
3
4
5
6
7
8
1
11
9
See page 1-18 for reassembly illustration.