beautypg.com

Installing cablerail by feeney, For azek rail – AZEK Rail User Manual

Page 7

background image

Page 7

Installing CableRail by Feeney

®

for AZEK Rail

1”

Anchor posts should not
exceed 60 feet apart during
any continuous run of cable.

Optional - Protector Sleeves
are not required on the through
posts, but do offer a more
fi nished appearance.

Use a dab of adhesive on
Protector Sleeve if needed.

PRE-DRILL
THROUGH POST
SLEEVES

• For the through

posts, drill a 1/4”
hole through both
the Post and Post
Sleeve.

• Using the marks on

the Anchor Posts, drill
a through hole only in
the Post Sleeve with a
1/4” Bit drill.

PRE-DRILL
ANCHOR POST
SLEEVE

Leave about 1” of machine
thread exposed for cable
take-up.

DRIVE IN HANGER BOLTS

• On Anchor Posts, screw the Hanger Bolts

into the pilot holes in the Post with the
Hanger Bolt Installation Tool.

• Once Hanger Bolts are all driven in, then

screw on Quick-Connect Fittings.

3

1

2

Pre-drill 1/8”
into 4”x4”

Drill through
Post Sleeve
with 1/4” bit

1/4”

1/8”

Protective
Sleeve (X2)

1/4”

1/4”

Drill through
Post Sleeve
with 1/4” bit

Drill through
Post Sleeve
with 1/4” bit