beautypg.com

Bc d – AZEK Rail User Manual

Page 13

background image

Page 13

Installing AZEK Rail Stairs with CableRail by Feeney

®

Lower the rails perpendicular to
the deck surface.

TRANSFER HOLE
LOCATION ON
POST SLEEVE

• Mark Ends of Top Support Rail.
• Rotate Rail assembly out of way to fasten Support Block.
• Secure Mounting Brackets to Posts.

10

8

9

Use a 3/16” drill bit to
transfer marks onto the
Post Sleeve

Pre-drill

7/64”

#8 x 3” Green

Coated
Screws

Pre-drill

7/64”

#8 x 3” Green

Coated
Screws

b

c

d

• Place the Bottom

Rail over the Bottom
Support Rail with
the Intermediate
Baluster(s).

• Use an extra

Intermediate
Baluster as a
template to mark
for CableRail
hardware and
through holes.

INSTALL BOTTOM
RAIL

ATTACH TOP SUPPORT RAIL

Step 1

Step 2

a