beautypg.com

Installing azek rail with cablerail by feeney – AZEK Rail User Manual

Page 4

background image

Page 4

CUT AND PREP BOTTOM RAIL AND TOP SUPPORT RAIL

INSTALL BOTTOM SUPPORT RAIL

• Position rail assembly onto Support Blocks.

5

4

6’ sections require 1
Intermediate Baluster;
8’ sections require 2
Intermediate Balusters.
10’ sections require 3
Intermediate Balusters.

#8 x 3” Green
Coated Screws

#8 x 3” Green
Coated Screws

• Cut to length.
• Attach Brackets to the Top Support Rail.

• Measure distance between the posts at the Bottom Rail and Top Support Rail.

Top Support Rail

Top Support Rail

Bottom Rail

Pre-drill 3/16”

8 x 3/4” Coated
Screws

Use
Intermediate
Base Plate as
template

Bottom Rail

Installing AZEK Rail with CableRail by Feeney

®