Installing azek rail with cablerail by feeney – AZEK Rail User Manual
Page 4
Page 4
CUT AND PREP BOTTOM RAIL AND TOP SUPPORT RAIL
INSTALL BOTTOM SUPPORT RAIL
• Position rail assembly onto Support Blocks.
5
4
6’ sections require 1
Intermediate Baluster;
8’ sections require 2
Intermediate Balusters.
10’ sections require 3
Intermediate Balusters.
#8 x 3” Green
Coated Screws
#8 x 3” Green
Coated Screws
• Cut to length.
• Attach Brackets to the Top Support Rail.
• Measure distance between the posts at the Bottom Rail and Top Support Rail.
Top Support Rail
Top Support Rail
Bottom Rail
Pre-drill 3/16”
8 x 3/4” Coated
Screws
Use
Intermediate
Base Plate as
template
Bottom Rail
Installing AZEK Rail with CableRail by Feeney
®