Installing azek rail with cablerail by feeney – AZEK Rail User Manual
Page 5
Page 5
Installing AZEK Rail with CableRail by Feeney
®
INSTALL BOTTOM RAIL
ATTACH INTERMEDIATE BALUSTERS
7
6
Bottom Rail
Intermediate
Baluster
Pre-drill
3/16”
#10 x 2” Coated
Screws
Screw Chase
For ease of installation, pre-drill
screw chase with a 3/16” drill bit.
Ensure the screw fi nds the screw
chase.
• Place the Bottom Rail between the posts and allow the rail to
rest on the Bottom Support Rail.
Bottom
Support Rail
Bottom Rail