final Checklist for Installation of Nor-Lake, Inc. Walk-in and Refrigeration
Location#
Sales Order #
dear Refrigeration Contractor:
Our goal is to supply our customers with the best equipment available. This is accomplished by combining
the highest quality commercial refrigeration equipment with a craftsman like installation that meets all factory
requirements. This document will help you understand and verify the installation meets these requirements.
This document is to be used in conjunction with the Nor-Lake Installation and Operation Instruction Manual and
the floor plan drawings provided with the product.
When the job is complete and equipment is running to factory specifications, the attached inspection report must
be filled out completely and returned to Nor-Lake.
If there are any questions, concerns, service or parts needs, please contact the Nor-Lake Installation Department
at 877-503-5253 or fax to 715-386-4293. Please have the equipment model number and serial number at the time
of your call.
Things to verify When Inspecting an Installation:
(Shaded areas to be filled out by the installing refrigeration contractor)
Walk-In
yes
No
Repairs Made
GC Review *
1. Were any components that were to be supplied by Nor-Lake missing from the
delivery? Verify all the components delivered to the job site match the Nor-Lake
packing list.
2. Is the surface that the walk-in is to be installed upon smooth and level to within
plus or minus 1/2” over the length of the slab? (It is recommended a string level or
laser level be used to verify the slab meets these requirements.) The walk-in shall
not be installed if the levelness of the slab does not meet these requirements.
3. Was the 6 ml polyethylene film vapor barrier installed prior to the floor panels
being installed?
4. Is the walk-in centered in the space provided with a minimum of 3” clearance
between the walk-in and building walls on each side?
5. Are the cavities between the building envelope and walk-in external walls free of
debris and remain unobstructed?
6. Are there any damaged panels or other components, dents or unsightly scratches
in the supplied walk-in floor, wall or ceiling panels?
7. Is the base of the walk-in caulked around the perimeter?
8. Are all of the wall panels level across the top? Are walls plumb and ceiling level?
9. Are there any gaps identified between wall panels following engagement of the lock
and strike? The panel gasket must be in contact with the metal edges of both panels.
10. Is the door section and door plug plumb and level? Does the door close properly?
(Verify door closing by opening the door to 90°. Door must close and seal without any
assist).