IT Cooling
Technical, Installation and Maintenance Manual :6912497 V1.5.0 02_2013
Operational Maintenance checks
Owners Responsibility
To ensure that the unit can be maintained correctly the following requirements are required.
Maintain a safe working environment around the unit, free from obstructions and debris.
The unit shall follow the following maintenance regime as a minimum.
The equipment contains live electrical and moving parts, ISOLATE prior to maintenance or repair work.
Ensure Lock off procedures is carried out accordingly.
Maintenance Schedule
Item
Task
Frequency
Unit Inspection
6 Mths
12 Mths
60 Mths
General
Inspections
Check for visible mechanical damage to unit.
Check for cleanliness
Visually inspect the unit for general wear and tear, treat
metalwork.
Rust should be inhibited, primed and touched up with matching paint.
Check for excess vibration from other rotating equipment.
Coil Guard
Cleaning
Ensure that the coil guard is free from debris.
Electrical
Inspection
Check main power supply voltages
Check electrical terminals are tight.
Check that the control panel and fan assembly cables are
securely fastened together.
Check amperages are as per design.
Controls alarm log
Check alarm log for any spurious events.
Dual Power Supply
Check operation of dual power supply.
Static Transfer
Switch
Check operation of static transfer switch. Referrer to
manufacturer information.
Uninterrupted
Power Supply
Check operation of UPS. Ensure battery within UPS is
holding charge.
Service tools / Test Equipment
Voltmeter
Screwdrivers/ Allen keys
Safety Equipment
Safety Glasses/ Goggles