Veris Technologies Quad 2800 Soil EC Mapping System - Operating Instructions User Manual
Page 4
![background image](/manuals/259671/4/background.png)
OM17-Quad2800
2-2
Figure 1. EC Surveyor kit
Figure 2. DataLogger kit
Use protective shipping/storage case to protect electronics components whenever electronics are
shipped. Keep all diagnostics and operations manual with system when mapping.
Mount instrument in a location that is as free as possible from dust, vibration, and electrical
interference. Display should be visible to operator and shielded from direct sunlight. Use
adjustable mounting brackets to position electronics for optimal visibility (Figure 3).
Figure 3.
EC
Surveyor
SD
card
reader
Mtg
bracket
Power
cord
Signal test
box
Mtg
bracket
Power cord
Signal test
load
Serial
cable
SoilViewer
software