How to install the module, Task 1: compare the power ratings, Figure 2-3: sample power ratings – Network Technologies 900GV User Manual
Page 25: How to install the module -5, Task 1: compare the power ratings -5

Installing the DIGITAL VNswitch 900GV 2-5
How to Install the Module
How to Install the Module
The hot-swap feature allows you to install the module into the DIGITAL MultiSwitch
900 without turning off power. Seating the module initiates the power-up.
To install the module, complete the following tasks.
Task 1: Compare the Power Ratings
Compare your module’s power requirements (1) with the values shown in the Chassis
Manager (2) status display (Figure 2-3).
If any of the module’s power requirements exceed the values shown in the status
display, add another power supply (see the DIGITAL MultiSwitch 900 Owner’s
Manual).
Figure 2-3:
Sample Power Ratings
2
NPB-1048-98F
1
41.0W
6.70 A
5 V
15 V
12 V
Available: 90.5 W
5V: 13.0 A, 15V: 3.5 A
0.50 A
0.12 A