beautypg.com

Nortel Networks Remote Gateway 50 User Manual

Page 97

background image

Bandwidth Management

Page 97 of 258

Main Office Configuration for Survivable Remote Gateway 50

Configuration Guide

Table 6 describes the network configuration and the steps that a call takes
during its setup.

Table 6
Configuration details for the general case

Region

Call progress
steps

Configuration detail and call progress
during call setup

1, 2, 3

UDP used for all calls within the region.

1, 2, 3

UDP used for region to region calls.

1, 2, 3

Prefixes for branch offices for regular calls are
required for all branch offices. May have additional
prefixes for E-911 calls, if required, or may share
prefixes.

1

1

All branch offices are provisioned at the NRS to route
all outbound calls (from the branch office) through
the main office. (NRS tandem configuration).

1

2

Main office sends all UDP calls to destinations that
are not its own branch office to the NRS with
unchanged dialled digits.

1

3

Main office sends all UDP calls to destinations that
are its own branch office to the NRS with a specific
gateway prefix in front of the dialled digits.

1

4

All branch offices delete the prefix and any LOC
codes, and terminate the calls. May be to a local set
or to a trunk.

2,3

Similar call setup steps take places for calls within
region 2 and 3.