beautypg.com

G. removal and replacement of condenser – Hoshizaki REFRIGERATED PREP TABLE WITH RAISED RAIL 73168 User Manual

Page 51

background image

51

G. Removal and Replacement of Condenser

CAUTION

1. Always install a new drier every time the sealed refrigeration system is

opened.

2. Do not replace the drier until after all other repair or replacement has been

made. Install the new drier with the arrow on the drier in the direction of the
refrigerant flow.

3. When brazing, protect the drier by using a wet cloth to prevent the drier from

overheating. Do not allow the drier to exceed 250°F (121°C).

1) Move the power switch to the "OFF" position, then unplug the unit.
2) Remove the panels.
3) Remove the refrigeration system cartridge. Perform steps 1 through 14 in "IV.B.1.

Recovery Procedure." Once the refrigeration system cartridge is out, proceed to step 4.

4) Remove the condenser thermistor (clogged filter).
5) Disconnect the condenser inlet and outlet piping.
6) Remove the condenser assembly.
7) Remove the air guide, evaporator case cover bracket, and condenser shroud (A) from

the old condenser and attach it to the new condenser. See Fig. 4.

8) Place the new condenser assembly in position.
9) Remove the drier, then place the new drier in position.

10) Braze all fittings while purging with nitrogen gas flowing at a pressure of 3 to 4 PSIG.
11) Replace the condenser thermistor (clogged filter) in its correct position.
12) Once the repair is complete, return to step 15 in "IV.B.1. Recovery Procedure" for

refrigeration system cartridge replacement.

Condenser

Condenser Thermistor
(clogged filter)

Condenser Shroud (A)

Air Guide

Evaporator Case
Cover Bracket

Fig. 4