Harmar Mobility HIGHLANDER CPL1200 User Manual
Page 2
![background image](/manuals/96734/2/background.png)
Table of Contents
Installing the lift
Using the Manual
2
When You Receive the Lift
3
Specifications
3
Safety
3
Code
Requirements
4
Site
Requirements
4
Required
Tools
4
Required
Materials
4
Preparing to Install the Lift
5
Controller Harness Connections
5
Installing
the
platform
6
Installing the outer guard panel
7
Installing the fixed ramp
7
Installing the folding ramp
8
Anchoring the Lift
9
Setting the Limit Switches
10
Verifying Operation of the Lift
11
Manual
Override 12
Call-Sends
(optional)
12
Top Landing Gate (optional)
13
EMI and Flush Strike (optional)
14
Platform Gate (optional)
15
Fascia Panel (optional)
16
Owner’s
Section 17
Safety
18
Controls
19
Operating the Lift
20
Warranty
22
Using the Manual
This manual will provide step by step instructions on how to install and operate your lift. Read
and understand the entire manual before beginning to install the lift.
If you have any questions, contact Harmar technical service at 1-866-378-6648
2