beautypg.com

Installation, Did you know – Hotpoint WT640 User Manual

Page 7

background image

7

GB

Installation

Drainage Connection

Although you may need to move the hooked end

support along the grey drainage hose, DO NOT

remove it.

Whichever drainage method you use,make sure

that the hooked end support is fixed level to, or

above the ‘Plumbing Indicator Line ’(see Description

page 3).

We recommend one of the following:

Standpipe method:
1. Make sure the standpipe

height is a minimum 500 mm

up to a maximum 1200mm

from the floor.

2. Insert the drainage hose

approximately 100mm into

the standpipe.

Under sink method:
1. Cut off the blocked end

of the under sink

drainage unit,or remove

the blanking plug if

fitted.

2. Fix the hooked end

support a minimum of

800mm from the floor.

3. Use a hose clip (e.g. a

jubilee clip) to securely

attach the grey drainage

hose end to the under

sink drainage unit.

Electrical connections

•

Before plugging the appliance into the mains socket,

make sure that:

•

the socket is earthed and in compliance with the

applicable law.

•

the socket is able to sustain the appliances

maximum power load indicated in the Technical

Details table (see page 17 ).

•

the supply voltage is included within the values

indicated in the Technical Details table (see page 17 ).

•

the socket is compatible with the machines plug.

If this is not the case,replace the socket or the

plug,ensuring a 13A fuse is fitted.

The machine should not be installed in an outdoor

environment, not even when the area is sheltered,

because it may be very dangerous to leave it exposed

to rain and thunderstorms.

When the machine is installed, the mains socket

must be within easy reach and should be connected

to a suitable electrical supply.

Do not use extensions or multiple sockets.

The power supply cable must never be bent or

dangerously compressed.

The power supply cable must only be replaced by an

authorised serviceman.

The company denies all liability if and when these

standards are not respected.

Before you start using your machine

The first wash cycle

Once the appliance has been installed and before you

use it for the first time, run a wash cycle without

detergent and no laundry. This will check your

installation,connections and drainage and will

thoroughly clean the interior before you carry out an

actual wash programme on your laundry.

This will take approximately 2

1

/

2

hours to complete.

Run the 95 °White Cotton programme ‘2’, without

laundry and without detergent.

During this cycle check for any leaks from under the

machine. If present ensure all hoses are securely

tightened.

Installation

Did you know?...

•

...it is very important to ensure that your hoses or cables are not kinked or squashed as this can lead

to your machine failing to fill or empty the water.

•

...it is very important to respect the dimensions given within the drainage connection methods (see above).

•

...if using the undersink drainage method remember to cut off the blocked end, or remove the blanking plug.

•

...you will be charged for a service engineers visit if a problem with your machine is caused by

incorrect installation or misuse.

800 mm

Hose

clamp

50 cm min-

120 cm max

Hooked

end

support