Installation procedures – haier AB124FAAHA User Manual

Page 26

background image

24

Piping Materials & Heat Insulating Materials

As to prevent condensation, heat insulating

treatment should be performed. The heat

insulating treatment for piping should be done

respectively.

Piping

Material

Heat Insulating

Material

Hard PVC tube VP31.5mm

(inner bore)
Vesicant polythene

thickness: over 7mm

Hose

The attached hoses can be used to adjust the eccentricity and angle of the hard PVC tube.

Stretch the hose directly to make connections as to avoid distortion. The soft end of the hose should be
positioned with a clamp.
The hose should be used in the lateral direction.

Heat Insulating Treatment:

Wrap the connection between the clamp and the root segment of the indoor unit without any gap with heat

insulating materials as shown in the drawing

Lifting Drainpipe

The drainpipe can be lifted 360mm.

When the down gradient of the drainpipe can’t be ensured, after upright

lifting, the drainpipe is in the down slope.

Confirming Drainage

The drainage should be confirmed during the test run to make sure that there is

leakage at the connection.

The confirmation of drainage should be also performed during the installation in

the winter season.

Fill water from the outlet or the specified position and confirm the drainage.

Fill 600cc water with a hose from the outlet or the specified location on the machine.

Add the water slowly. Don’t add water to the motor of the drainage pump.

After mounting the electrical system, do refrigerating operation and meanwhile

add water and check.

If the electrical installation hasn’t been completed, pull out the terminal(2P)

of the floater switch on the electrical cabinet. After confirming the drainage,

connect the terminal of the floater switch and run the drainage pump for 5

minutes until it stops automatically.

Confirm the sound of the motor:

Confirm the sound of the motor of the drainage pump and meanwhile check

the drainage.

20

45

o

eccentricity adjustment (max.20mm)

o

45 bending (max.)

hose

indoor unit

hose

hose clamp

hose

hose clamp

attached heat

insulating material

heat insulating

material

horniness pvc pipe

lifting

360mm below

lifting 500mm below

100mm

below

indoor unit

under the ceiling

joint of drainpipe

Installation Procedures

This manual is related to the following products: