Figure 8.9 Ceiling/Attic Construction

H. Complete Installation

WARNING! Risk of Fire! You MUST maintain 2 in.

(51 mm) air space to insulation and other combustible

materials around the chimney system. Failure to do so

could cause overheating and fire.

• Keep chimney sections from separating or twisting.

• You may secure straight chimney sections at the joints

with screws no longer than 1/2 in. (13 mm).

The following steps should be skipped if using a

chase.

• Install roof flashing appropriate to roof pitch.

• Install round termination cap and storm collar.

I. Install Flashing

• Assemble chimney so it passes through the framed

opening.

• Slip the flashing over the chimney.

NOTICE:

Roofing shingles must be below the flashing

plate on the lower side of a sloped roof and over the

flashing plate on the sides and top.

• Nail the flashing to the roof. Keep gaps between the

flashing plate and the roof to a minimum.

• Caulk the flashing plate and roof junction as well as the

vertical seam on the flashing. All nail heads must be

caulked with a roofing sealant.

Heat & Glo • BAY-40, PIER-40 • 34977 • Rev AE • 05/07/13

G. Cut out Hole in Roof

• Refer to Figure 8.9.

• Plumb from roof to center of chimney.

• Drive a nail up through roof to mark center of pipe.

• Measure to either side of nail and mark the 17 in. x 17

in. (432 mm x 432 mm) opening required.

• Measure opening on the horizontal; actual length may

be larger depending on roof pitch.

• Cut out and frame opening.

• Refer to

Chapter 25 of the Uniform Building Code for

roof framing details.