Installation – Hotpoint EG1000EX User Manual
Page 29

CONVERSION FOR USE ON BUTANE OR PROPANE
Each hob burner requires the injector to be replaced and each burner gas tap
to have the by-pass screw adjusted according to the following procedure:
1.
Lift off the burner cap and the burner body and place it to one side.
2.
Remove the injector from the burner base with a suitable box spanner and
discard.
3.
Replace the injector with the appropriate replacement (see Table on the
previous page).
4.
Repeat for each burner.
5.
Replace the burner bodies and caps, taking care that they are positioned
correctly.
6.
Remove the tap knob from the left hand hotplate tap. Insert a narrow flat
screwdriver centre of the tap spindle and turn fully clockwise. Replace the
tap knob. Repeat this procedure with the other hotplate taps.
7.
Position and fix the self-adhesive LPG conversion label over the gas details
on the rating plate label.
29
Installation
- E6004 (16 pages)
- GF760RX (16 pages)
- HW170LIW (24 pages)
- GW81 (40 pages)
- G750 (16 pages)
- 50cm Free Standing Electric Cooker EW36G (28 pages)
- GE641TX (16 pages)
- GQ641TSI (16 pages)
- HW170LIK (24 pages)
- GQ74SI (16 pages)
- ET6004 (16 pages)
- GF640 (16 pages)
- C320IX (7 pages)
- CEM 645 D C (12 pages)
- BE72 (24 pages)
- N321IX (9 pages)
- Gas Hob GC640IX (16 pages)
- 60 cm Electric Cooker HUE (28 pages)
- CRA 641 DC (16 pages)
- GW74 (36 pages)
- CIO 644 DD Z (16 pages)
- BE32 (16 pages)
- BG05 (16 pages)
- CRO 742 DO B (16 pages)
- G320X (12 pages)
- GQ74ST (16 pages)
- EC6005 (16 pages)
- EG21 (32 pages)
- CIC 642 C (16 pages)
- G740 (16 pages)
- GD74 (16 pages)
- BE82 (24 pages)
- EC604 (12 pages)
- COOKER AND OVEN (16 pages)
- E6014 (12 pages)
- GW38X (28 pages)
- E6005 (16 pages)
- CRA (16 pages)
- HW170GK (24 pages)
- EG95 (44 pages)
- GF960 (20 pages)
- E6002 (16 pages)
- 50cm Free Standing Gas Cooker CH50GCIK (24 pages)
- EC6011 - EC6014 (12 pages)