beautypg.com

2 connect input power-ac or dc, Figure 6 power connections, Connect input power—ac or dc – Emerson SiteLink-12E User Manual

Page 10: Figure 6, Power connections, Ground 24ac/26dc, 2 connect input power—ac or dc

background image

Connect Input Power Wiring

6

3.2

Connect Input Power—AC or DC

Liebert SiteLink-E modules may be powered with either alternating current or direct current within

the operating range of 21.6-26.4 volts. The input power terminals are in the upper right corner of the

module (see Figure 1 for location).

1. Turn the Liebert SiteLink-E module’s power switch Off.

This prevents the module from being powered up before the wiring is completed and the proper

voltage is verified.

2. Make sure the 24VAC power source is Off.
3. Pull the screw terminal connector from the control module’s power terminals labeled 24VAC/DC

and Gnd.

4. Connect the transformer wires to the screw terminal connector (see Figure 6).
5. Apply power to the power supply.
6. Measure the voltage at the Liebert SiteLink-E’s power input terminals to verify that the voltage

is within the operating range of 21.6-26.4 VAC.

7. Insert the screw terminal connector into the Liebert SiteLink-E’s power terminals.

Figure 6

Power connections

Output

+VIN 12V

Input

-VIN

VDD
VSS

GND

Ground

24ac/26dc

DC Power

AC Power

AC/DC Power Input

Terminals (upper right corner

of Liebert SiteLink-E module)

Input Power

Terminal Label

(use as connection guide

This manual is related to the following products: