beautypg.com

0 execution, 1 installation of precision cooling units, 2 field quality control – Emerson Liebert CW User Manual

Page 26

background image

Guide Specifications

22

2.11.6 Floor Stand

The floor stand shall be constructed of a heliarc-welded, tubular steel frame. The floor stand shall

have adjustable legs with vibration isolation pads. The floor stand shall be ____ inches high.

2.11.6.1 Floor Stand Turning Vane

A factory-supplied, field-mounted turning vane shall be provided.

2.11.6.2 Smoke Sensor

The smoke sensor shall immediately shut down the environmental control system and activate the

alarm system when activated. The smoke sensor shall be mounted in the electrical panel with the

sensing element in the return air compartment.

2.11.6.3 Liebert SiteScan

®

Site Monitoring System

Provide a Liebert SiteScan monitor system with the Liebert CW. The Liebert SiteScan shall have the

capability to monitor and change (at the user direction) the temperature setpoints and sensitivities of

each unit. The printer shall provide the user with chronological alarm information. It shall also be

capable of being programmed to print out environmental conditions or operating modes at each unit.

3.0

E

XECUTION

3.1

Installation of Precision Cooling Units

3.1.1 General

Install precision cooling units in accordance with manufacturer’s installation instructions. Install

units plumb and level, firmly anchored in locations indicated, and maintain manufacturer’s recom-

mended clearances.

3.1.2 Electrical Wiring

Install and connect electrical devices furnished by manufacturer but not specified to be factory

mounted. Furnish copy of manufacturer’s electrical connection diagram submittal to electrical con-

tractor.

3.1.3 Piping Connections

Install and connect devices furnished by manufacturer but not specified to be factory-mounted. Fur-

nish copy of manufacturer’s piping connection diagram submittal to piping contractor.

3.2

Field Quality Control

Startup mainframe coolant units in accordance with manufacturer’s startup instructions. Test con-

trols and demonstrate compliance with requirements.