beautypg.com

Installation steps – Envision Peripherals Water-Furnace IM1609 10 User Manual

Page 13

background image

12

ENVISION CONSOLE INSTALLATION MANUAL

Installation Steps

Step 1: Unpack Equipment and Inspect for Damage

Step 2: Determine Equipment Location

Choose level flooring surface (Correctable with shims. Do not pitch towards drain.)

Location of wall support and fasteners required to secure chassis backplate.

Easy access for both installation and service.

Consider availability and ease of wiring, water piping and condensate drain.

No obstructions to block airflow in front of the unit.

Step 3: Mark Unit Position

Ensure that floor is level. If shims are required, make sure that the entire compressor compartment area is uniformly


shimmed and that the backplate mounting height is increased by the thickness of the shims used.

Position backplate in desired equipment location. To further reduce the operating sound level of the unit, 1/8-inch thick


rubber matting may be placed under the chassis to eliminate vibration on hard flooring surfaces. (Make sure back plate
is level).

Mark and cut floor or wall penetrations for electrical wiring, water and condensate piping.

Optional Electrical Disconnect and Motorized Outside Air Damper

Mark and cut wall penetrations for field fabricated outside air duct sleeve.

Align mounting holes with backplate and attach with screws supplied.

1=1/07<3B

1=16/AA7A

1=<232@/7<:=1/B7=<

=>B7=

0/::D/:D3A
=>B7=

>B>:C5A
=>B7=

E/B3@
=CB

E/B3@
7<

1=0/19>:/B3
=>B7=

E/::>3<3B@/B7=<
4=@E/B3@1=<<31B7=<

4:==@>3<3B@/B7=<
4=@E/B3@1=<<31B7=<

4CA323:31B@71/:
27A1=<<31B=>B7=

;=B=@7H32
2/;>3@
=>B7=

;=B=@7H32
2/;>3@
=>3<7<5

Figure 1

This manual is related to the following products: