• Press START, wait until the measuring is over and make sure the value measured is

consistent with what you requested.

• If necessary, save the measurement you performed by pressing the SAVE key (ref.

chapter 4.7).

4.6.2 Measuring on a power plant

Technicians and repair engineers may use this instrument in order to check out the
efficiency of the system and its compliance with specific regulations.

• Connect the instrument between each cable to be tested and the ground.

• Pre-set configurations can be used. For example, use the up or down arrow keys to

select P25: this will set a measurement of 500 V for 1’ (minute).

• Should you intend to perform tests using other parameters, choose the appropriate

settings (ref. chapter 4.5).

• Press START, wait until the measuring is over and make sure the value measured is

consistent with what you requested.

• If necessary, save the measurement you performed by pressing the SAVE key (ref.

chapter 4.7).