Confirming performance – Rosen Aviation 0300-412 : Briefing Controller User Manual
Page 7

Rosen Aviation
RosenView Briefing Controller
Document Number: 100853
Revision: D
Date: 01/06/14
Template: 4.4.1.6FM2; Revision A; 12/06/12
Page 7 of 11
2.4. Confirming Performance
1.
Apply 28V DC power to the RosenView LX/MX to turn on the controller and confirm
that it is operating properly.
2.
Verify the controller display screen will light up and display the following messages
during startup.
and …….
Allow a minute or two for the Briefing Controller to perform a self-test and the
RosenView LX/MX to complete startup. After the RosenView LX/MX completes
startup, the controller is ready to play a briefing.
Note: If the screen does not light up or the display searching for RosenView
does not change, see the
The briefing names that have been loaded into the RosenView LX/MX will display
on the controller when the controller knob is turned.
Note: The Briefing Controller does not come with briefings already installed. For
information about how to load cabin briefings on the RosenView LX, see the
RosenView LX Software Configuration Manual (P/N 100379) that is bundled with
the
based Configuration Tool:
3.
Rotate the knob in either direction to select a briefing and push the knob to play the
briefing.
Play is indicated by a repeating arrow sequence, as shown below.
4.
When the briefing is finished, the display returns to the briefing selection screen.
You will see only briefings loaded into the RosenView LX/MX unless you have no
briefings loaded and you will see Briefing 1.