7 - hydraulic connection – MCZ Toba HYDRO 22 User Manual
Page 36

34
55
55
55
55 55 55
196
91
142
146
3
4
5
6
1
2
7 - HYDRAULIC CONNECTION
HYDRAULIC CONNECTION
IMPORTANT!
The connection of the stove to the plumbing system must be carried out ONLY by specialised personnel who are
capable of carrying out installation properly in compliance with current standards in the country of installation.
The manufacturer will not be held responsible for damage to persons or property in the event of failed operation if
the aforementioned warning is not complied with.
It is important that ONLY qualified engineers are used to fit and commission the appliance in ALL cases. The installing
engineer MUST hold a QCF recognised biomass qualification. Any company using sub-contractors MUST ensure they also
hold the relevant qualifications (ONLY FOR UK).
1
SAFETY DRAIN
5
DOMESTIC COLD WATER INLET (if applicable)
2
SYSTEM REFILL
6
SYSTEM RETURN
3
SYSTEM DELIVERY
4
DOMESTIC HOT WATER OUTLET (if applicable)
IMPORTANT!!!
CLEAN THE ENTIRE SYSTEM BEFORE CONNECTING THE STOVE, IN ORDER TO REMOVE ALL RESIDUE AND DEPOSITS.
Always install shutters in the system leading to the stove so as to disconnect it from the hydraulic system in order to
carry out routine and/or special maintenance.
Connect the stove using flexible pipes.