Installation and assembly assembling the cladding – MCZ Flair User Manual
Page 28

A
b
b
b
b
c
c
c
c
c
c
b
b
26
6-INSTALLATION AND ASSEMBLY
ASSEMBLING THE CLADDING
ASSEMBLING THE CERAMIC SIDE PANELS
The product is supplied with the ceramic panels packaged separately, therefore unpack all the parts before proceeding with the assembly.
Follow the sequence below to assemble the panels:
• Flaps “b” on t
he lower part of the ceramic panel A must be fitted into the holes of the structure of the stove. Then fasten the panel to
the structure - pos.c - with the screws supplied (two screws at the top).
This manual is related to the following products: