beautypg.com

MCZ Flair User Manual

Page 20

background image

18

6-INSTALLATION AND ASSEMBLY

PREPARATION AND UNPACKING

The FLAT stove is delivered on a pallet with several packages (fig.1):

• The first package contains the stove.

• The second package contains the ceramic panels and is stacked on top of the structure package.

The FLAIR stove is delivered in two different packages (fig.2/2A):

• The first pallet contains the stove.

• The second pallet contains the serpentine panels.

Open the package, remove the four brackets from the pallet (2 front and 2 rear), which block the stove to the pallet (fig. 3). The brackets

are removed by loosening the two screws and removing the bracket.

Set the stove in the pre-selected place, making sure this complies with the requirements.

The product must always remain in a vertical position and handled solely with a cart. Pay particular attention to the door and its glass,

protecting them from mechanical knocks that would compromise their integrity.

In any case, the product must always be handled with care. If possible, unpack the product near the place of installation. The packaging

materials are neither toxic nor harmful, and therefore no particular disposal measures are required. The end user is responsible for product

storage, disposal or possible recycling in compliance with the regulations in force.

FIGURE 1 -

FLAT STOVE PACKAGE

FIGURE 2 -

FLAIR STOVE PACKAGE

FIGURE 2A - FLAIR STOVE SERPENTINE PACKAGE

This manual is related to the following products: