Warning – Emerson BP7251 User Manual
Page 8
21. Position the receiver by passing the opening in
the receiver over the hanger pipe (Figure 14A).
22. Connect the black wire from the wiring harness to
the black (hot) supply wire (Figure 6A). Connect
the white wire from the wiring harness to the white
(neutral) supply wire. Connect the green ground
wires from the hanger bracket and the hanger ball
to the supply ground wire. Use wire connectors
(supplied).
23. Securely connect the wiring harness connector to
the receiver connector, and connect the blue and
yellow wires from the downrod to the blue and
yellow wires from the receiver (Figure 6A).
24. Fold and position the wires into the space above
the hanger ball and into the outlet box
(Figure 14A).
25. Feed the wires and connectors through the open
side of the hanger bracket, and into the outlet
box. Slide the receiver up and over the hanger
bracket. Press the receiver against the ceiling and
hold it in place. Then lift the ceiling cover up to the
threaded studs and turn until studs protrude
through the holes in the ceiling cover
(Figure 15A).
26. Secure the ceiling cover in place by sliding
lockwashers (supplied) over the threaded studs and
installing the two knurled knobs (supplied).
(Figure 15A.) Tighten the knurled knobs securely
until the ceiling cover fits snugly against the ceiling
and the hole in the ceiling cover is clear of the
downrod.
29. Attach one blade assembly to the motor hub using
two 10-32 x 5/8” oval head screws (supplied)
(Figure 17A). Do not tighten completely at this time.
Install remaining blade assemblies in the same
way. Gently snug all flange screws to the motor
hub, working around the hub in a clockwise
sequence. Next, securely tighten all flange screws,
again working in a clockwise sequence. Failure to
follow this procedure could result in fan wobble.
This completes the blade installation.
30. Pass the connectors and the wires form the motor
shaft through the washer (supplied) and position the
washer over the motor shaft (Figure 17A).
8
1-1/4"
THREADED
STUD
LOCKWASHERS (2)
CEILING COVER
KNURLED KNOB
Figure 15A
To avoid possible fire or shock, make sure that the
electrical wires are completely inside the outlet box and
not pinched between the ceiling cover and the ceiling.
WARNING
!
BLADE
FLANGE
10-32 x 3/8"
PAN HEAD SCREW
FLAT WASHER
FAN BLADE
Figure 16A
MOTOR HUB
BLADE FLANGE
10 - 32 x 5/8"
OVAL HEAD SCREW
(2 Per Blade Assembly)
WASHER
MOTOR
SHAFT
Figure 17A
HANGER
BRACKET
HANGER
BALL
CEILING COVER
SW375
RECEIVER
OPEN
SIDE
1-1/4" THREADED
STUD
Figure 14A
27. Use three 10-32 x 3/8” pan head screws and flat
washers (supplied) to secure the flange to the
blade (ordered separately) (Figure 16A). Repeat for
the four remaining blades.
28. Use the 10 round recessed holes in the motor hub
marked with “5” and install the five blade
assemblies in accordance with Step 29.