beautypg.com

Initial installation – Enviro Sonnet C-11253 User Manual

Page 22

background image

�� �����

�� �����

Install sealed throat connector or flashing to prevent leakage of

room air up through chimney.

DV Only: Before installing vent liners, mark each liner on both

ends to designate which is the intake and the exhaust.

Measure the height of the chimney beforehand and purchase the

appropriate kit. Never attempt to over-stretch a flexible liner to

accommodate the height of the chimney.

The flue damper can be fully blocked open or removed for

installation of the Sonnet; the smoke shelves, shields and baffles

may be removed if attached by mechanical fasteners.

The chimney must be clean, in good working order and

constructed of non-combustible materials.

Make sure that all chimney cleanouts are tight fitting and will not

permit air to leak into the chimney.

DV Only: The air intake can be increased to a standard 3” size

using Adaptor (50-1499 - 2” to 3” Air Intake) included with this unit.

Refractory, glass doors, screen rails, screen mesh and log grates

can be removed from the fireplace before installing the Sonnet.

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 40: Installation of Sonnet DV and BV.

22

Table 5: Vent termination clearances

Minimum Clearance

Description

3 ft (0.9 m)

Clearance above the highest point where it passes through a roof surface,

refer to Figure 39.

24 in (0.6 m)

Clearance above a roof ridge, any other portion of a building, or any other

obstruction within a horizontal distance of 10 feet (3 m), refer to Figure 39.

5 ft (1.5 m)

Clearance for a vent or chimney above either the highest connected appli-

ance drafthood outlet, or flue collar.

6 ft (1.83 m)

Clearance to mechanical air supply inlet.

3ft (0.9m)

Clearance to each side of center line extended above meter/regulator as-

sembly.

6 ft (1.83 m)

Radial clearance around service regulator vent outlet.

12 in (30 cm)

Clearance above grade, verandah, porch, deck, or balcony.

3 ft (0.9 m)

Clearance to a building opening or combustion air inlet of another appli-

ance, except with the approval of the authority having jurisdiction for the

following reduced clearances.

9 in (0.23 m)

Exception for inputs up to and including 50,000 Btu/h (15kW)

12 in (0.3 m)

Exception for inputs exceeding 50,000 Btu/h (15kW) but not exceeding

100,000 Btu/h (30kW)

This manual is related to the following products: