beautypg.com

Preparation / before installation / installation, Before installation, Installation – Livarno 3940/052L User Manual

Page 8: Fitting the light, Directing the light

background image

8 GB

Preparation / Before installation / Installation

- Pencil / marking tool
- Voltage tester
- Screwdriver
- Electric drill
- Drill
- Edge cutter
- Ladder

Before installation

Important: The electrical connection must be
carried out by a qualified electrician or someone
trained to perform electrical installations. This person
must be familiar with the features of the light and
the connection requirements.

Familiarise yourself with all instructions and
diagrams in this manual as well as with the
light before installation.

Before installation, ensure that the cable that
the light is to be attached to is not live. Remove
its fuse or switch off the automatic cutout in the
fuse box (0 position).

Use the voltage tester to check that there is no
voltage.

Installation

Fitting the light

Remove the screws

2

visible on the side of the

terminal housing

6

and take the installation

frame

1

on the back off (see diagram).

Mark the boreholes using the slotted holes pro-
vided for the screws in the installation frame

1

.

Now drill the screw holes (approx. 6 mm, depth
approx. 40 mm). Ensure that the feed cable is
not damaged.

Insert the dowels into the drilled holes. Fasten
the mounting bracket

1

in place with the

supplied screws.

Connect the light’s connection cable to the
mains connection cable

3

using the insulating

screw joint

4

(see diagram).

Ensure that the cables have been connected in
line with the correct colour coding.

Now connect the earthed conductor (green-
yellow) to the earth terminal labelled in the
terminal housing

6

(see diagram).

Screw the light onto the installation frame

1

using the screws

2

.

Bend the flexible arm

7

to achieve the desired

direction.

Mark the fixing holes for the ceiling brackets

11

.

Note that the drilled holes are always between
two spots

8

(see diagram). This achieves a

more secure fastening.

Drill the fixing holes (approx. 6 mm, depth
approx. 40 mm) for the ceiling brackets

11

.

Insert the dowels into the drilled holes.
Fasten the ceiling brackets

11

in place with

the supplied screws.

Screw the ceiling bracket clips

10

into the

ceiling brackets

11

.

Clamp the flexible arms

7

into the ceiling

bracket clips

10

.

Place the lamp glass

13

carefully over the

fitting

12

and fasten it in place by tightening the

threaded ring

14

using the supplied tool

15

.

Use a clean, fluff-free cloth when you are
replacing a bulb

16

.

Rotate the bulb

16

carefully clockwise into

the fitting.
Check that the bulb is correctly seated.

Your light is now ready for operation.

Directing the light

Never change the direction of the light while it
is switched on.

Allow the light to cool completely.

Turn the individual spots

8

at their bases in

the desired direction. The spots

8

can be

turned through approx. 270°.

This manual is related to the following products: