beautypg.com

Inside vertical installations, Outside vertical installations, Installation – Enviro 50-1574 User Manual

Page 15

background image

15

2 ft

(61 cm)

Rain Cap (ensure cap

is at least 3ft (91cm)

above the roof at the

lowest point)

Roof Flashing

Roof Rafter

Fire Stop with

Support Collar

Ceiling Joist

Vertical Vent Pipe

Clean Out Tee with

Pipe Adapter

EF 5

NOTE: All vent sections must

maintain 3 inches (7.6 cm)

clearances to combustibles.

Installation

I

NSIDE

V

ERTICAL

I

NSTALLATIONS

:

1. Choose a stove location that is ideal. See the section “D

ECIDING

W

HERE

TO

L

OCATE

YOUR

P

ELLET

A

PPLIANCE

.”

2. Place a non-combustible hearth pad where necessary.

Figure 14: Inside Vertical Installation.

3. Place the unit on the hearth pad (if

installed on a carpeted surface) and

space the unit in a manner so when

the pellet vent is installed vertically,

it will be 100mm (4”) away from a

combustible wall.

4. Locate the center of the fresh air

intake pipe on the unit. Match that

center with the same point on the

wall and cut a hole about 40mm

(15⁄8”) in diameter.

5. Install the fresh air intake pipe.
6. Install the tee with clean out.
7.

I

nstall the pellet vent upward

from there. When you reach the

ceiling, make sure that the vent

goes through the ceiling fire stop.

Maintain a 100mm (4”) distance

to combustibles and keep attic

insulation away from the vent pipe.

Maintain an effective vapor barrier.

8. Finally, extend the pellet vent to go

through the roof flashing.

9. Ensure that the rain cap is

approximately 900 mm (36”) above

the roof.

O

UTSIDE

V

ERTICAL

I

NSTALLATIONS

:

To accomplish a outside vertical pipe installation, follow steps 1 through 5 in the “I

NSIDE

V

ERTICAL

I

NSTALLATIONS

- F

REESTANDING

” section and then finish it by performing the following (refer to Figure 15).

1. Install a tee with clean out on the outside of the house.
2. Install vent pipe upward from the tee. Make sure that you install support brackets to keep the vent

straight and secure.

3. Install ceiling thimble and secure the flashing as you go through the roof.
4. Ensure that the rain cap is approximately 900 mm (36”) above the roof.