beautypg.com

Safety instructions / before use / operation, Before use installation, Electrical safety – Parkside PSE 2800 A1 User Manual

Page 18: Environmental protection, Earthing, Operation

background image

18 GB/MT

Safety instructions / Before use / Operation

11. Emission levels are represented in the technical

data under the stated values for sound power
level (L

WA

) and sound pressure level (L

pA

) and

are not compulsory definite working levels. Be-
cause there is a connection between emission
levels and immission levels, this can not reliably
used to determine the potentially necessary ad-
ditional precautions. Influencing factors on the
workforce‘s current immission level includes the
properties of the work area, other noise sources,
air borne sound, etc. such as e.g. the number
of machines and other neighbouring processes
and intervals, to which the user is exposed. Also
the admissible immission levels can vary from
country to country. However, this information
gives the user of the machine the opportunity to
have a better estimation of the risks and dangers.
Occasionally acoustic measurements should be
take after installation in order to determine the
sound pressure level.

ATTEnTIon: only use unleaded normal
petrol as fuel.

Important! Switch off
the engine before refueling.

Important! Hot parts.
Keep your distance.

Please read all safety in-
formation and instructions.

Failure to observe the safety information and in-
structions can result in electric shock, fire and / or
serious injury.

keep all safety advice and instructions in
a safe place for future reference.

Before use

Installation

You will need two open ended spanners
for install this device (spanner size 12).

Install the stand

17

, wheels

15

and the push

bar

19

as shown in figures F–I.

Install all parts before pouring in the fuel and
oil to avoid the fluids leaking.

To install the wheels first push the wheel axle

16

through the brackets on the underside of the
generator and install the wheels

15

as shown

in figure G.

Ensure that when installing the push bar

19

the

slanting side (fig. I / Pos. I1) is slanting outwards.

Electrical safety

Electrical cables and attached devices must be
defect free.

Never connect the generator to the mains
(power point).

Keep the cables as short as possible.

Environmental protection

Dispense of polluted maintenance and operating
materials in a suitable collection point.

Earthing

Earthing is needed to disperse static discharge.

Connect a cable from one side of the earthing
connector

4

of the generator (fig. C / Pos. 4)

and from the other side to an external ground.

operation

ATTEnTIon! When being used for the first

time, motor oil (15 W-40, approx. 0.6 l) and petrol
(unleaded normal petrol) must be put in.

Check the fuel level and the oil, and if necessary
top them up.

… / Cleaning, maintenance, storage, transport and ordering replacement parts