Cfr a – Jordan Valve Mark CFR Series Pressure Reducing Supply Реле User Manual
Page 2

M
ark
CFr S
erieS
P
reSSure
r
eduCing
S
uPPly
r
egulatorS
-2-
I
nstallatIon
c
ontInued
,
9.
Should the Mark CFR regulator be installed
in an existing installation, it may be nec-
essary to install spacers on the mounting bolts
to adapt to the installation. If mounting
bolts are too long place a spacer on
the mounting bolt and ensure at
least two full threads of engagement.
s
tartup
and
a
djustment
1.
Once installation is complete and downstream
equipment is properly adjusted, slowly open the
supply and downstream shutoff
valves (if installed) while using pressure gauges
to monitor supply and outlet pressure.
2.
Should outlet pressure adjustment be required,
install and monitor outlet pressure using
a gauge during the start-up procedure.
The Mark CFR regulator outlet pressure can
be raised or lowered by loosening the locknut
(10), and turning the adjustment screw (3),
clockwise to increase outlet pressure, or counter
clockwise to decrease outlet pressure.
3.
Tighten the locknut (10) one the desired outlet
pressure has been properly set as required.
4.
Periodically inspect the regulator for signs or
wear or damage, and repair or replace
as necessary.
For more information or questions, please contact a
Jordan Valve Representative.
m
ark
cFr a
ssembly