Jordan Valve Mark D & DA Series Globe & Angle Control Valve User Manual

Page 4

background image

-4-

Packing Replacement

Warning

Prior to performing any maintenance

procedures, review the warning notes at the

beginning of the Maintenance section.

1.

Isolate the control valve from the line pressure,

release pressure from both sides of the valve

body, and drain the process media from both

sides of the valve.

2.

Disconnect any operating lines providing air

pressure, control signals or electrical power

to the actuator. Use lockout procedures to en-

sure the above measures stay in effect while

you work on the equipment.

3.

Disconnect the stem connector, and then re-

move the actuator from the valve body by un-

screwing the actuator yoke locknut (Key 4).

4.

Loosen the packing flange nuts (Key 2) so the

packing is not tight on the valve stem. Remove

travel indicator parts and stem locknuts from

the valve stem threads.

5.

Unscrew the bonnet (Key 6) from the valve

body (Key 7). Carefully lift off the bonnet and

plug/stem assembly (Key 19) as a unit.

6.

Remove the plug/stem assembly from the bon-

net. If you plan to re-use the valve plug, pro-

tect the plug seating surface and the stem

threads to prevent damage.

7.

Remove the bonnet gasket (Key 17).

8.

Cover the opening in the valve body to protect

the gasket surface and prevent foreign material

from entering into the valve body.

9.

Remove the packing flange nuts, packing

flange, upper wiper, and follower (Keys 2, 3,

10, and 11). Carefully push out all the

remaining packing box parts from the bonnet

using a rounded rod or other tool that will not

scratch the packing box wall or bottom guide

bushing.

10.

Clean the packing box bore and the metal

packing box parts.

11.

Inspect the valve stem threads and pack

ing box bore for any sharp edges that might

cut the packing. Scratches or burrs could

cause packing box leakage or damage to new

packing.

12.

Install a new bonnet gasket (Key 17), making

sure the gasket seating surfaces are clean

and smooth. Carefully install the plug/stem

assembly into the valve body. Then slide the

bonnet over the stem and thread it tightly into

the valve body, see torque values in Table 3.

13.

Use the sequence shown in Figure 2 to install

new packing and associated parts.

14.

Slip a smooth-edged pipe over the valve stem,

and gently tap each soft packing part into the

packing box.

15.

Slide the packing follower, upper wiper, and

packing flange (Keys 11, 10, and 3) into

position.

16.

Lubricate and install the packing flange studs

(Key 1), and nuts.

17.

For spring-loaded PTFE V-ring packing, tighten

the packing flange nuts (Key 2) until the

shoulder of the packing follower (Key 11) is

approximately 5/8” above the top of the bonnet.

18.

For other packing arrangements, tighten the

packing flange nuts (Key 2) alternately

in small equal increments. Continue until one

of the nuts reaches the minimum torque shown

in Table 1. Then tighten the remaining pack

ing flange nut until the packing flange is level

and at a 90-degree angle to the valve stem.

19.

Mount the actuator on the bonnet (Key 6) and

connect the actuator and valve plug stem ac-

cording to the procedure in the appropriate

actuator instruction manual.

20.

Check for leakage around the packing follower

when you put the control valve assembly into

service. Retighten the packing flange nuts as

required.