Commissioning

Addendum operating requirements

DBWB30-40US-UUS113610

9/12

4 Commissioning

Figure 4: Display and LED

1. Check the following requirements before commissioning:

• Correct mounting and correct connection of the inverter.
• Correct layout of the line circuit breaker.
• Correct grounding of the small wind turbine system according to the manufacturer's

instructions.

• Rectifier and overvoltage protection (e.g. Windy Boy Protection Box) between the small

wind turbine system and the inverter have been installed.

2. Commission the small wind turbine system according to the instructions of the manufacturer.

☑ The green LED glows or blinks: commissioning has been successful.
or
☑ The red or yellow LED glows or blinks: an error has occurred.

Object

Description

Explanation

A

Green LED

Operation

B

Red LED

Ground fault

C

Yellow LED

Disturbance