ShoreLand'r LUB29CBSW V.3 User Manual
Page 11

Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0003685
Page 11
REV C 07/29/2011
Locate two of the 1/2” x 2 9/16” x 5 ½” U-bolts. Drop them
down through the holes in the arm weldments just identified
as shown in the diagram. Place the U-bolts so one of the
U-bolt legs is on each side of the side frame. Place one
of the metal plates provided onto the legs of the U-bolts.
Secure with 1/2” flange lock nuts.
Slide the load guide forward or backward on the frame until
the rear of the load guide does not extend past the rear of
the boat. Tighten the load guide in this position.
Repeat the above process on the load guide for the other
side of the trailer.
Assembly is complete.
Remove all items from the box and sort by size.
Note that the arm weldments of the load guide are identical
so there is no right or left part.
Locate the arm weldments and the carpeted bunks. Attach
the carpeted bunks to the arm weldments using the 5/16” x
1 1/2” hex bolts and lock washers provided. Tighten.
Make sure the boat is centered on the trailer before at-
tempting to install the load guides.
Position one of the load guide assemblies on the top side of
the side frame and move in or out until the desired clear-
ance has been established between the load guide and
the boat. Select the proper pair of holes that you will use to
mount the arm weldments to the side frame.
LU0106 Lund Load Assembly Instructions
The LU0106 load guides are designed to fit on the Lund
boat trailers manufactured with 2 x 4 side frame tubing .The
length of the mounting U-bolts provided will accommodate
this size tubing only. Mounting on a smaller or larger side
frame tube may not be possible because of the U-bolt
length. .