beautypg.com

Diagram b – ShoreLand'r LAV55TBB V.2 User Manual

Page 4

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0004179

Page 4

03/23/2010

Diagram B

SAFETY CHAINS

Locate the 1/2” x 5” hex bolt. Slip the bolt through a 1/2” flat washer,

then place through the last link of one of the safety chains.

Place the bolt with chain attached through the hole provided in the

bottom front of the actuator mount on the tongue. Place the second

chain on the portion of the bolt extending through the other side

of the tongue. Place on another 1/2” flat washer and hex lock nut.

Tighten.

RETRACTABLE TIE DOWNS

Locate the two retractable tie downs. Next locate one of the 7/16”

x 1 ½” fine threaded bolts supplied with the retractable tie down.

Insert it into the bottom hole on the retractable tie down so the bolt

is pointing through the back side of the tie down. Insert the bolt

through the hole provided in the taillight bracket just inside the side

frame. Secure with the 7/16” flange lock nut. Tighten.

Repeat the above process on the other tie down.

WINCH POST ASSEMBLY

Your trailer may have come with the jack already installed on the

winch base. However, in the event that it did not, use the following

instructions to attach the jack to the winch base before it is installed

on the tongue.

WINCH POST INSTALLATION

The height that the bow eye is placed in your boat will determine

the length winch post required. Once this is determined, attach the

winch base to the tongue with three 1/2” x 4” carriage bolts and

lock nuts.

Align the holes in the Profile 2000 mounting channel with the holes