Diagram b – ShoreLand'r LAV55TBB V.2 User Manual
Page 4
Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0004179
Page 4
03/23/2010
Diagram B
SAFETY CHAINS
Locate the 1/2” x 5” hex bolt. Slip the bolt through a 1/2” flat washer,
then place through the last link of one of the safety chains.
Place the bolt with chain attached through the hole provided in the
bottom front of the actuator mount on the tongue. Place the second
chain on the portion of the bolt extending through the other side
of the tongue. Place on another 1/2” flat washer and hex lock nut.
Tighten.
RETRACTABLE TIE DOWNS
Locate the two retractable tie downs. Next locate one of the 7/16”
x 1 ½” fine threaded bolts supplied with the retractable tie down.
Insert it into the bottom hole on the retractable tie down so the bolt
is pointing through the back side of the tie down. Insert the bolt
through the hole provided in the taillight bracket just inside the side
frame. Secure with the 7/16” flange lock nut. Tighten.
Repeat the above process on the other tie down.
WINCH POST ASSEMBLY
Your trailer may have come with the jack already installed on the
winch base. However, in the event that it did not, use the following
instructions to attach the jack to the winch base before it is installed
on the tongue.
WINCH POST INSTALLATION
The height that the bow eye is placed in your boat will determine
the length winch post required. Once this is determined, attach the
winch base to the tongue with three 1/2” x 4” carriage bolts and
lock nuts.
Align the holes in the Profile 2000 mounting channel with the holes