ShoreLand'r TA0165 User Manual
Accessory, Ta0165
Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0004039
Page 1
01/27/2009
ACCESSORY
TA0165
Bunk Loadguide for PT1420 - PT1720 Models
ASSEMBLY AND INSTALLATION INSTRUCTIONS
Assembly Instructions
Break the bundles and sort all items. Locate the post load
guide weldments and position one on the rear cross mem-
ber.
Orient the weldment as shown in the diagram. Place two
– 3/8” x 2 7/16” x 4” U-bolts up around the cross member
and into the holes provided in the weldment. Secure with
3/8” flange lock nuts. Do not tighten. Repeat this process
with another post load guide weldment on the front cross
member.
Position the carpeted bunk on the outside of the weldments
just installed as shown in the diagram. Attach the bunk to
both the front and rear weldments using the bolts already
installed in the bunks. Secure to the weldments using 3/8”
lock washers and hex nuts.
Repeat the above process on the other load guide on the
other side of the trailer.
Adjustment
With the pontoon properly centered on the trailer slide the
load guides out until they are within ½” of the inside of the
pontoon tube. Tighten in position. Tighten the bolts attach-
ing the bunks to the weldments. This is a good starting
point for adjusting. They may need to be adjusted differ-
ently depending on the splash guard on the front of the
pontoon tubes. Unload and reload the pontoon to make
sure they are adjusted to best fit your pontoon. They can be
repositioned to best fit your need.
Adjustment is complete.