Diagram d – ShoreLand'r PT2325AB User Manual
Page 6

Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0003964
Page 6
05/14/2008
SPRINGS
Position the axle under the frame so it is properly orientated. All
2” x 2” pontoon axles have holes drilled for mounting brake lines.
These attaching holes must be positioned to the rear of the trailer.
(If a brake axle is being installed, make sure axle is oriented so the
brake backup plates are on the right sides of the trailer. (Right on
right and left of left.)
Place the springs under the axle as shown so the closed eye of the
spring is to the front of the trailer. Drop two ½´x 2 9/16´x 5” square
U-bolts down around the axle and on each side of the spring as
shown.
Diagram D
Align the legs of the U-bolt with the holes in a spring pad and then
insert so the spring pad is up against the spring. Secure with ½”
flange lock nuts. Tighten to keep all items in position but do not se-
curely tighten until the axle assembly is completely installed under
the frame.