beautypg.com

ShoreLand'r PT21ABL User Manual

Page 7

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003582

Page 7

REV A 5/01/06

SPRINGS

Position the axle so it is properly aligned with the trailer. Place the

springs on the topside of the spring pads welded to the axle. (See

Diagram D). Note that the hook end of the spring must be mounted

to the rear of the trailer. Place a spring clamp on the top center of

the spring as shown. Next place the ½” x 6 ½” U-bolts down over

the top of the spring clamp, spring and axle as shown.

Place the spring and axle U-bolt plate onto the ends of the two U-

bolts just placed. Thread ½” lock nuts onto the U-bolts but do not

tighten securely until the complete unit is in position on the trailer.

Repeat on the other spring.

AXLE

Place one of the spring bracket bushings into the rear of the spring

bracket and secure with a 9/16” x 3 1/4” hex bolt and hex lock nut.

Repeat in other spring bracket.

Position the axle under the frame, then hook the hook loop of the

spring around the bushings just installed. Note that if the axle is

positioned too low when trying to hook, the hooks will not hook

around the bushings.

Raise the front of the springs up so they align with the front hole of

the spring bracket. Secure in place with 9/16” x 3 ¼” hex bolts and

lock nuts.

Tighten all axle U-bolts and spring bolts not tightened at this time.

ONE AXLE BRAKE INSTALLATION

Cut the tape securing the brake line hose to the axle. Place the

other end of the hose up through the hole provided in the brake line

clip bracket. Secure in place with the U-shaped hose clip provided.

Remove the brass plug from the end of the hose.

Remove the plastic cap from the end of the frame brake line com-

ing out of the side frame by the axle. Carefully uncoil the brake line

so that it will reach the end of the hose just attached to the brake

line bracket. Thread the brake line fitting into the brake line hose.

Tighten.

DO NOT OVER TIGHTEN

NOTE: The axle has brake fluid installed in the clusters and the

axle line when it is assembled at the factory. This is done to protect

the inner parts of the brake system during shipping and storage.

The complete brake system including the axle

MUST be re-bled to

ensure that all air has been removed from the brake system.

Fill the actuator reservoir with brake fluid and bleed the line per the

bleeding instructions in one of the following; UFP Brake Bleeding

Manual or the ShoreLand’r Disc Brake Manual. Refill the reser-

voir and replace the reservoir cap.

TIRE AND WHEEL ASSEMBLIES

Mount the tire and wheel assemblies using the ½” fine threaded

tapered lug nuts provided. Tighten to 85-95 ft/lb. of torque using the

rotation pattern as shown in the ShoreLandr’s Owners Manual.

Re-torque the lug nuts after 50 miles of driving and then periodi-

cally thereafter.

This manual is related to the following products: